KGF hydraulic Cylinders and Pumps in Action on a temporary Bridge in Breclav, CZ, 8/2026
Popis videa
In August 2026, Strabag dismantled a temporary bridge in Břeclav, Czech Republic. The temporary bridge weighed 300 tonnes and was around 100 metres long. It was assembled and dismantled using a set of four KGF K50-150HS hydraulic cylinders (load capacity 50 tonnes, stroke 150 mm) and an electric hydraulic pump (PE5000-330M).
The two-way temporary bridge was in use in Břeclav for over a year while a new road bridge was being constructed, connecting Břeclav with its other districts and lying on the main route from Brno to Austria. The bridge was built by Strabag.
Further information on bridge lifting and KGF hydraulic cylinders, pumps, and accessories (e.g. hydraulic hoses, valves, manifolds, and speed couplers) can be found here:
www.kgf.cz
www.linkedin.com/in/jiří-kučera-28289a76
www.hydraulika-kgf.cz
The two-way temporary bridge was in use in Břeclav for over a year while a new road bridge was being constructed, connecting Břeclav with its other districts and lying on the main route from Brno to Austria. The bridge was built by Strabag.
Further information on bridge lifting and KGF hydraulic cylinders, pumps, and accessories (e.g. hydraulic hoses, valves, manifolds, and speed couplers) can be found here:
www.kgf.cz
www.linkedin.com/in/jiří-kučera-28289a76
www.hydraulika-kgf.cz














